AMRAP Set Logging
Log your rep-out sets easily. See how your ceiling improves session over session — a clear sign of getting stronger.
Beginner Linear Progression
AMRAP sets mean you always go as far as you can. IronFlow tracks your Greyskull progress with a fast, mobile-friendly gym log.
Fit check
A Beginner Strength plan for 3 training days per week. Confirm the schedule and equipment below before starting.
Lifters at Beginner level who want a Strength plan and can train 3 days per week.
Your schedule or training needs do not match 3 days per week and the listed equipment: Barbell, Dumbbell.
A beginner linear progression using AMRAP top sets to drive strength and autoregulated progress.
Program shape
See how many planned work sets each week contains and how the block is paced over time.
Planned work sets from the stored template
Each block represents one programmed week
What is Greyskull LP?
Greyskull LP is a beginner barbell program by John Sheaffer. Based on Starting Strength, it adds AMRAP (as many reps as possible) on the final set of every main lift — giving you a performance metric every session and enabling faster progress.
Log your rep-out sets easily. See how your ceiling improves session over session — a clear sign of getting stronger.
Add 5lbs per session to upper body, 10lbs to lower. IronFlow tracks your progression and flags when to reset.
Squat, Press A/B, Deadlift — manage your alternating schedule without losing track of where you are.
Relevant alternatives
These plans share some of this program's schedule, goal, experience, or equipment profile.
More tools
Every exercise below comes from the importable template currently stored in the app.
2x5, 1x5+ (AMRAP). Rest 3-5 min.
2x5, 1x5+ (AMRAP). Use assistance or negatives if needed.
2x5, 1x5+ (AMRAP). Rest 3-5 min.
2x5, 1x5+ (AMRAP). Rest 3-5 min.
2x5, 1x5+ (AMRAP). Rest 3 min.
1x5+ (AMRAP only). One heavy set. Rest 3-5 min.
2x5, 1x5+ (AMRAP). Rest 3-5 min.
2x5, 1x5+ (AMRAP). Use assistance or negatives if needed.
2x5, 1x5+ (AMRAP). Rest 3-5 min.
Progression contract
When it changes
at the end of the stored block · by your logged decision
What changes
The stored schedule carries the planned week-to-week changes.
After success or failure
Use the source program's success criteria to decide whether to advance, hold, or repeat.
Deloads
A deload or taper is mentioned in the stored program guidance; review it before advancing.
The stored template has 3 training days per week. Check the day-by-day preview before you start.
The catalog describes 2 programmed weeks. The schedule preview is generated from the same plan data used in the app.
The source describes the progression, but this template does not claim to apply it automatically. Use the progression card and source guidance when deciding what to change.
No. You can select and start the template in guest mode; signing in is optional for sync and backup.