Skip to content

Built-in training plan

Juggernaut Method Base Template

Chad Wesley Smith's 16-week strength cycle uses a 90% training max and four four-week waves: 10s, 8s, 5s, and 3s. Each wave moves through accumulation, intensification, realization AMRAP, and deload weeks. Review the full schedule, then follow this plan in IronFlow.

Example built-in strength training plan in IronFlow
Juggernaut Method Base Template
Days / week
4
Weeks
16
Level
Intermediate
Focus
Strength

Is Juggernaut Method Base Template right for you?

Plan profile: Level Intermediate · Focus Strength · Training days per week: 4. Confirm the schedule and equipment below before starting.

Who it is for

Training level: Intermediate · Plan focus: Strength · Training days per week: 4

Choose another plan if

This plan may not match your schedule or training needs. Training days per week: 4 · Equipment: Barbell

Plan at a glance

Chad Wesley Smith's 16-week strength cycle uses a 90% training max and four four-week waves: 10s, 8s, 5s, and 3s. Each wave moves through accumulation, intensification, realization AMRAP, and deload weeks.

Max lifts
SquatBench PressDeadliftOverhead Press
Equipment
Barbell
Days / week
Training days each week: 4
Weeks
Planned weeks: 16
Sample week
Week 1

Plan shape

See how many planned work sets each week contains and how the block is paced over time.

Weekly volume

Planned work sets from the stored plan

work sets

Plan length

Each block represents one planned week

16
weeks

Compare this program with nearby alternatives

Compare similar plans to understand their schedules, progression rules, and tradeoffs before choosing.

Compare the closest fits

These plans share some of this plan's schedule, goal, experience, or equipment profile.

Explore the other training tools

Day-by-day schedule

Every exercise below comes from the built-in plan stored in the app.

Day 1

Accumulation (10s) - Squat

3 exercises
Squat
4 x 60% x 10 / 60% x 10+

Quads

Front Squat
3 x 10 @ RPE 7

Quads

Barbell Row
3 x 8-12 @ RPE 8

Back

Day 2

Accumulation (10s) - Bench Press

3 exercises
Bench Press
4 x 60% x 10 / 60% x 10+

Chest

Close-Grip Bench Press
3 x 10 @ RPE 7

Chest

Pull-Ups
3 x 8-12 @ RPE 8

Back

Day 3

Accumulation (10s) - Deadlift

3 exercises
Deadlift
4 x 60% x 10 / 60% x 10+

Back

Deficit Deadlift
3 x 10 @ RPE 7

Back

Barbell Row
3 x 8-12 @ RPE 8

Back

Day 4

Accumulation (10s) - Overhead Press

3 exercises
Overhead Press
4 x 60% x 10 / 60% x 10+

Shoulders

Push Press
3 x 10 @ RPE 7

Shoulders

Pull-Ups
3 x 8-12 @ RPE 8

Back

How it progresses

Manual rule

When it changes

at the end of the stored block · when the AMRAP threshold is met

What changes

The stored schedule carries the planned week-to-week changes.

After success or failure

Use the source guidance to decide whether to advance, hold, or repeat.

Deloads

A deload or taper is mentioned in the stored plan guidance. Review it before advancing.

Questions about Juggernaut Method Base Template

Ready to run Juggernaut Method Base Template?