5/3/1 Building the Monolith

Jim Wendler's high-volume strength block emphasizes compound lifts and conditioning tolerance. Review the full schedule, then follow this plan in IronFlow.

Example built-in strength training plan in IronFlow
5/3/1 Building the Monolith
Days / week
3
Weeks
6
Level
Intermediate
Focus
Strength

Is 5/3/1 Building the Monolith right for you?

Plan profile: Level Intermediate · Focus Strength · Training days per week: 3. Confirm the schedule and equipment below before starting.

Who it is for

Training level: Intermediate · Plan focus: Strength · Training days per week: 3

Choose another plan if

This plan may not match your schedule or training needs. Training days per week: 3 · Equipment: Barbell

Plan at a glance

Jim Wendler's high-volume strength block emphasizes compound lifts and conditioning tolerance.

Max lifts
SquatBench PressDeadliftOverhead Press
Equipment
Barbell
Days / week
Training days each week: 3
Weeks
Planned weeks: 6
Sample week
Week 1

Plan shape

See how many planned work sets each week contains and how the block is paced over time.

Weekly volume

Planned work sets from the stored plan

work sets

Plan length

Each block represents one planned week

6
weeks

Compare the closest fits

These plans share some of this plan's schedule, goal, experience, or equipment profile.

Explore the other training tools

Day-by-day schedule

Every exercise below comes from the built-in plan stored in the app.

Day 1

Squat / Press

4 exercises
Squat
65% x 5 / 75% x 5 / 85% x 5

Quads

Overhead Press
65% x 5 / 75% x 5 / 85% x 5

Shoulders

Chin-ups
5 x AMRAP

Back

Dips
5 x AMRAP

Triceps

Day 2

Deadlift / Bench

4 exercises
Deadlift
65% x 5 / 75% x 5 / 85% x 5

Hamstrings

Bench Press
65% x 5 / 75% x 5 / 85% x 5

Chest

Dumbbell Row
5 x 10-15

Back

Face Pull
5 x 15-25

Shoulders

Day 3

Squat / Press Volume

4 exercises
Squat
65% x 5 / 75% x 5 / 85% x 5

Quads

Overhead Press
65% x 5 / 75% x 5 / 85% x 5

Shoulders

Barbell Row
5 x 8-12

Back

Leg Raises
5 x 10-20

Abs

How it progresses

Manual rule

When it changes

at the end of the stored block · by your logged decision

What changes

The stored schedule carries the planned week-to-week changes.

After success or failure

Use the source guidance to decide whether to advance, hold, or repeat.

Deloads

No separate deload or taper is encoded in this plan.

Questions about 5/3/1 Building the Monolith

Ready to run 5/3/1 Building the Monolith?