Workout A
Heavy day. Ramp across all 5 sets to the day's top set.
Heavy day. Ramp to the top set of 5.
Heavy day. Ramp to the top set of 5.
Import-ready templateSupports progression engine
The classic heavy/light/medium barbell progression for post-novice lifters who still want weekly jumps. Review the full schedule, then run the template inside IronFlow.
Fit check
A Intermediate Strength plan for 3 training days per week. Confirm the schedule and equipment below before starting.
Lifters at Intermediate level who want a Strength plan and can train 3 days per week.
Your schedule or training needs do not match 3 days per week and the listed equipment: Barbell, Bodyweight.
The classic heavy/light/medium barbell progression for post-novice lifters who still want weekly jumps.
Program shape
See how many planned work sets each week contains and how the block is paced over time.
Planned work sets from the stored template
Each block represents one programmed week
Relevant alternatives
These plans share some of this program's schedule, goal, experience, or equipment profile.
More tools
Every exercise below comes from the importable template currently stored in the app.
Heavy day. Ramp across all 5 sets to the day's top set.
Heavy day. Ramp to the top set of 5.
Heavy day. Ramp to the top set of 5.
Light day. Use the reduced loading from the prior heavy day.
Use incline bench, matching the classic Workout B structure.
Heavy deadlift work performed on the light squat day.
Medium day with a top triple and a back-off set of 8.
Medium day with a top triple and a back-off set of 8.
Medium day with a top triple and a back-off set of 8.
Progression contract
When it changes
after each completed week · when all required sets are completed
What changes
Add 5 lbs to upper-body lifts and 10 lbs to lower-body lifts when the rule is met.
After success or failure
Repeat the current week or load when the required work is missed.
Deloads
No separate deload or taper is encoded in this template.
The stored template has 3 training days per week. Check the day-by-day preview before you start.
The catalog describes 1 programmed weeks. The schedule preview is generated from the same plan data used in the app.
This template declares a supported progression rule. After the required workout state is complete, IronFlow can use the rule to evaluate the next step.
No. You can select and start the template in guest mode; signing in is optional for sync and backup.